LEED Silver Certification Checklist
LEED Silver Certification Checklist
General Items
- Complete the LEED project registration.
- Gather documentation for all credit categories.
- Prepare for third-party verification.
- Review and submit the final application.
Site Selection
- Choose a location that is within a previously developed area.
- Avoid building on prime farmland and floodplains.
- Select a site with access to public transportation.
- Limit the impact on the surrounding ecosystem.
Water Efficiency
- Install low-flow fixtures and appliances.
- Implement a rainwater harvesting system.
- Use drought-resistant landscaping.
- Conduct a water usage audit.
Energy and Atmosphere
- Achieve at least 10% energy cost savings compared to ASHRAE standards.
- Use renewable energy sources.
- Optimize HVAC efficiency.
- Implement a building energy management system.
Materials and Resources
- Utilize at least 20% recycled content in materials.
- Use sustainably sourced materials.
- Implement a construction waste management plan.
- Provide storage for recyclables.
Indoor Environmental Quality
- Ensure adequate ventilation systems are installed.
- Use low-VOC materials.
- Implement a monitoring system for indoor air quality.
- Provide natural daylight in occupied spaces.
Sustainable Sites
- Integrate green roofs or living walls.
- Provide bike storage and facilities.
- Create outdoor spaces for occupants.
- Reduce heat island effect with reflective materials.
Generated from Panda Checklist
Get More Done with Checklist App
Stop juggling multiple tools and spreadsheets. Our app helps you organize tasks, collaborate with your team, and track progress all in one place.
Smart Task Management
Create and organize tasks with priorities, due dates, and reminders.
Team Collaboration
Share checklists, assign tasks, and track progress in real-time.
Progress Tracking
Visualize progress with charts and stay motivated with achievements.