Blue Tape Walk Through Checklist
Blue Tape Walk Through Checklist
Preparation
- Gather necessary materials (blue tape, marker, notepad)
- Schedule walkthrough with all relevant team members
- Review project scope and specifications prior to walkthrough
Exterior Inspection
- Check for proper grading and drainage
- Inspect exterior walls for damage or unfinished areas
- Examine roofing for proper installation and materials
- Ensure windows and doors are installed correctly and sealed
Interior Inspection
- Verify that all walls are finished and painted as per specs
- Check flooring for damage or installation issues
- Inspect ceilings for proper height and finishes
- Test all doors for proper operation and fit
Utilities and Systems
- Test electrical outlets and switches for functionality
- Inspect plumbing fixtures for leaks and proper installation
- Verify HVAC system installation and functionality
- Check for proper insulation in walls and attics
Final Review
- Walk through with the team to discuss findings
- Document all issues and mark with blue tape
- Assign responsibility for addressing each issue
- Schedule follow-up walkthrough to ensure completion of fixes
Generated from Panda Checklist
Preparation (3)
Gather necessary materials (blue tape, marker, notepad)
Schedule walkthrough with all relevant team members
Review project scope and specifications prior to walkthrough
Exterior Inspection (4)
Check for proper grading and drainage
Inspect exterior walls for damage or unfinished areas
Examine roofing for proper installation and materials
Ensure windows and doors are installed correctly and sealed
Interior Inspection (4)
Verify that all walls are finished and painted as per specs
Check flooring for damage or installation issues
Inspect ceilings for proper height and finishes
Test all doors for proper operation and fit
Utilities and Systems (4)
Test electrical outlets and switches for functionality
Inspect plumbing fixtures for leaks and proper installation
Verify HVAC system installation and functionality
Check for proper insulation in walls and attics
Final Review (4)
Walk through with the team to discuss findings
Document all issues and mark with blue tape
Assign responsibility for addressing each issue
Schedule follow-up walkthrough to ensure completion of fixes
Get More Done with Checklist App
Stop juggling multiple tools and spreadsheets. Our app helps you organize tasks, collaborate with your team, and track progress all in one place.
Smart Task Management
Create and organize tasks with priorities, due dates, and reminders.
Team Collaboration
Share checklists, assign tasks, and track progress in real-time.
Progress Tracking
Visualize progress with charts and stay motivated with achievements.